CUSTOM COAST CARS
Would you like to react to this message? Create an account in a few clicks or log in to continue.

Design, preparation and contracting

Go down

Design, preparation and contracting Empty Design, preparation and contracting

Post by kosovohp Thu Sep 30, 2010 5:01 am

Even before Congress approved the Boulder Canyon Project, the Bureau of Reclamation was considering what kind of dam should be used. Officials eventually decided on a massive concrete arch-gravity dam. The monolithic dam would be thick at the bottom and thin near the top, and would present a convex face towards the water above the dam. The curving arch of the dam would transmit the water's force into the abutments, in this case the rock walls of the canyon. The wedge-shaped dam would be 660 ft (200 m) thick at the bottom, narrowing to 45 ft (14 m) at the top, leaving room for a highway connecting Nevada and Arizona.[20]
On January 10, 1931, the Bureau made the bid documents available to interested parties, at five dollars a copy. The government was to provide the materials; but the contractor was to prepare the site and build the dam. The dam was described in minute detail, covering 100 pages of text and 76 drawings. A $2 million bid bond was to accompany each bid; the winner would have to post a $5 million performance bond. The contractor had seven years to build the dam, or penalties would ensue.[21]





Sydney Day Tours
cheap hotels in mykonos

kosovohp
OFFICAL CCC MEMBER
OFFICAL CCC MEMBER

Posts : 482
Join date : 2010-09-06

Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum